April was all about the condo. We had to re-finish both of the condo bathrooms. We installed a new toilet, vanity, and light in each bathroom and installed a new tub and tile in the big bathroom. We also put new flooring in the kitchen, installed new outlets and switches, painted and cleaned everything.
We also got some very big tasks accomplished at the house. A sub-contractor installed the new roof and gutters and we hired a company to install new windows. These two huge jobs made the outside of the house look a million times better than it did before.
No comments:
Post a Comment