The master bathroom really started to come together this month. The vanity was installed, tiled, grouted, and the fixtures were installed. The wall between the closet/shelf area was closed up as well.
The bedroom stopped looking so ghetto with a nice drywall patch job.
Samantha went on her first plane ride and we visited family in New Hampshire (with a side trip to Boston).
And just to throw in another sweet baby picture...
Up next...July!
No comments:
Post a Comment